Skip to content

Transfer to Verdict

Move your existing FedRAMP or CMMC engagement to Verdict, where your compliance is streamlined, automated, and delivered at a lower cost in less time.

Guaranteed 30% in price cut.Against your current provider’s fee for the work that remains.
Guaranteed 50% fasterThan the schedule that engagement is running to.
Cost to switch

Calculate the cost to switch

Enter what you are contracted for, what you have paid, and how far the work has got. The figure updates as you type, and the arithmetic behind it is shown in full rather than summarised: the 30% guarantee applied to what is left on your contract, our own published rate for the work that remains, and whichever of the two is lower.

Which program are you in?
Which class are you pursuing?

Class A is initial entry, Class B light agency use, Class C enterprise agency use. Our published fees are $7,500, $45,000, and $60,000, and a transfer is never quoted above the published fee for its class.

How far along are you?
Estimate

Total cost to switch to Verdict

$48,000

Our own rate for the work that remains sets this figure, and it already sits below the guarantee.

Left on your current contract$140,000
30% below that$98,000
Class C at 80% of $60,000$48,000
You keep$92,000

An estimate from the figures you entered, not a quote. The review step establishes what is actually complete and what your remaining contracted fee is, and the 30% guarantee is set against that figure either way.

The process

Three steps, and the first one has no commitment in it

  1. Review

    Verdict collects your current progress and compliance status from your original provider.

  2. Transfer

    Verdict handles the full transfer and migration of your existing work.

  3. Complete

    Verdict finishes your deliverables and prepares you for your assessor, at a lower cost and on a faster timeline.

The guarantees

What the guarantees measure

The fee guarantee is set against your current provider’s remaining contracted fee for the same scope of work, never against an industry average. The time guarantee is set against the schedule that provider has committed to for the work that remains, measured from the day the transfer completes to the day your package reaches your assessor. Both figures are established during the review step, confirmed in writing before you sign, and written into the engagement letter.

Where half the schedule goes

Cutting a timeline in half is only credible if you can say which hours disappear. On a transfer they come from four places, and none of them is working faster.

Sound work is inherited, not redone

The review step establishes what is complete, what is partial, and what has to be rebuilt, before any commitment is made. A boundary that is already defined is verified rather than renegotiated, and documentation that holds up is carried across. Rebuilding work that was fine is the single largest avoidable cost on a transfer.

Documentation is generated, not typed

Control documentation, System Security Plan assembly, and POA&M generation run on our platform, operated by our people. Assembly and formatting are where a preparation timeline usually goes, and they are the part of the work that does not need a person to sit through it.

Evidence is collected once, in one place

Every deliverable, request, and draft lives in the portal from the day it is produced. Nothing is assembled at the end out of email threads and shared drives, which is the step that turns a finished package into another six weeks.

The schedule is a term, not an estimate

The timeline is set against your current provider’s committed schedule during the review and written into the engagement letter. A date that is contractual is planned to differently by both sides than a date that is aspirational.

What neither guarantee covers, and cannot: the assessment itself, and the decision at the end of it. A C3PAO sets its own schedule, an independent assessor sets its own, and an agency authorizing official decides when they decide. Our commitment runs to the assessor’s door, because that is the stretch the work is ours.

The numbers

What advisory work is published at

For scale, not as the measure: the advisory fee for a Moderate authorization, compared like with like, from our FedRAMP cost and time page. The published midpoint is $200K against our Class C fee of $60K.

Published advisory feesVerdict
Published advisory fees, Moderate: $100K to $300KPublished advisory fees, Moderate$100K to $300K$200K midpoint$200K midpointVerdict, Class A to Class C: $7,500 to $60,000Verdict, Class A to Class C$7,500 to $60,000$60K, Class C$60K, Class C$0$60K$120K$180K$240K$300K
FigurePublished asSource
Consulting and advisory, Moderate$100K to $300K$100,000 - $300,000Knox Systems
Consulting / advisory line item$120K to $300KConsulting / Advisory $120k - $300kFedRAMP Cost
External consulting$100K to $500KExternal Consulting can add $100,000 - $500,000, depending on the scope and hourly rates ($150-$210/hour)Paramify
Verdict, Class C (Moderate)$60,000One-time engagement fee, with your 3PAO billed separately by your 3PAO.Verdict, published
CMMC

What CMMC Level 2 preparation is published at

Published fees for the preparation half of Level 2, and the same band with the 30% guarantee applied to it, which is arithmetic rather than a price list. What you would be quoted is measured against your own provider’s remaining fee.

Published preparation feesGuarantee applied
Published Level 2 preparation fees: $12K to $60KPublished Level 2 preparation fees$12K to $60K$36,000 midpoint$36,000 midpointSame band, 30% lower: $8,400 to $42,000Same band, 30% lower$8,400 to $42,000$25,200 at that midpoint$25,200 at that midpoint$0$12K$24K$36K$48K$60K
FigurePublished asSource
Documentation and System Security Plan$12K to $60KDocumentation and System Security Plan (SSP): $12,000-60,000Workstreet
Implementation consulting$15K to $50KCMMC RPO guidance: $15,000-$50,000CISPOINT
Outsourced documentation, Level 2$10K to $25KLevel 2: $10,000 to $25,000Paramify
Preparation work, billed hourly$250 to $400 per hourHiring external consultants to help with preparation tasks such as gap and readiness assessments, policy development, and control implementation can cost $250-$400 per billable hour.Secureframe
CMMC timeline

How long preparation is published as taking

The published window for the preparation half, and the same window with the 50% guarantee applied. Nothing here is a claim about how long a C3PAO takes.

Published preparation windowGuarantee applied
Published Level 2 preparation window: 6 to 18 monthsPublished Level 2 preparation window6 to 18 months12 month midpoint12 month midpointSame window, 50% shorter: 3 to 9 monthsSame window, 50% shorter3 to 9 months6 months at that midpoint6 months at that midpoint04 mo8 mo12 mo16 mo
FigurePublished asSource
Preparation window, Level 26 to 18 months6 to 18 months depending on current maturityKnox Systems
Time to full Level 2 readinessMonths to more than a yearthe timeline varies based on an organization’s current security posture, but many businesses require several months to more than a year to achieve full CMMC Level 2 readinessRed River
What a transfer does not change
$105K to $118K

The published Department of Defense estimate for a Level 2 third-party assessment. Your C3PAO bills that, not us, and no transfer makes it smaller.

According to the published DoD estimates, a Level 2 third-party assessment will cost between $105,000-$118,000. Secureframe

$75K to $300K

Total Level 2 cost most commonly reported for defense contractors, across assessment, remediation, tooling and advisory together.

CMMC Level 2: $75,000-$300,000 (most common for defense contractors) CISPOINT

$5K to $20K

What a gap assessment alone is priced at. On a transfer, the review that replaces it is part of the engagement.

An average gap assessment can range between $5,000 and $20,000, depending on specific factors. Red River

$37K to $49K

The Department of Defense estimate for a Level 2 self-assessment, per entity, before any third party is involved at all.

$37,000 to $49,000 per entity Knox Systems

Nor does a transfer change who assesses. Verdict prepares, and does not assess, audit, or certify: a CMMC Level 2 certification assessment belongs to a C3PAO, a FedRAMP package is evaluated independently, and an Authorization to Operate is the decision of an agency’s own authorizing official.

Every CMMC source above was read on 20 September 2026. Published figures move, so check them against the source rather than against this page if anything here matters to a decision.

Questions

Before you start a transfer

What happens to the work my current provider has already done?
It transfers. The review step exists to establish what is complete, what is partial, and what has to be rebuilt, before any commitment is made. Work that is sound is carried across rather than redone, which is most of where the time saving on a transfer comes from.
Does Verdict assess or certify the result?
No. Verdict prepares, and does not assess, audit, or certify. A CMMC Level 2 certification assessment is performed by a C3PAO, a FedRAMP package is evaluated independently, and an Authorization to Operate is the decision of an agency’s own authorizing official. Those parties are independent of us by design.

Start your transfer